A three phased program was developed to comply with SRF scheduling requirements and to
fast-track the replacement of the clearwell and pump station. The components of the three
phases are described below.
Phase 1 - New Clearwell and Pump Station
- 675,000 gallon cast in place concrete clearwell;
- Combined finished water / backwash water pump station;
- Replace lagoon overflow structures; and
- Site work
Phase 2 - Water Distribution System Improvements
- Storey Ave/Interstate 95 crossing water main replacement;
- Green Street, Newbury water main replacement (2,500 lf); and
- Dead end water main elimination:
- New 8” main on Bowlen Ave in Newburyport from Myrtle Ave to bend in road (250
lf)
- New 8” main on Hope Ave in Newburyport from Bowlen Ave (300 lf)
- New 8” main on Goldsmith Drive in Newburyport near Frances Drive (350 lf)
- New 8” main on Tracy Street in Newburyport at North Atkinson Street (150 lf)
- New 8” main on Finnegan Way at Dennett Drive (200 lf)
Pase 3 - WTP Building Upgrade / WTP Process Equipment Replacement / Residuals
Improvements / WTP SCADA Upgrade
- Residuals improvements:
- 425,000 gallon cast-in place concrete equalization tank for waste filter
backwash water
- Recycle pumps
- New sand and gravel in drying bed to level and provide better dewatering
capability
- SCADA Upgrade at the WTP
- Process equipment replacement:
- Replace two existing variable speed rapid mixers
- Replace the two existing horizontal shaft paddle flocculators
- Replace two existing tracked sludge removal systems in tube settler basins
- Replace actuators on valves in filter pipe gallery
- WTP Building System Upgrade:
- HVAC improvements for building
- New roof for WTP building
- New windows throughout WTP building
- Install fire sprinkler system for WTP building
- Replace suspended ceiling in building
- Electrical improvements